A typical ESP
installation is The ESP system’s major surface and downhome equipment is shown.
Technical Data used in the field explained in petroleum courses in
Rawalpindi, In this installation, the available surface power is
transformed to the down hole power requirements by three single-phase
transformers.
The transformed
power is supplied by a power cable to a switchboard and then through a junction
box and wellhead/tubing support. The power cable is run in with the production
tubing string and is banded to the tubing to prevent mechanical damage during
installation and removal. The power cable is spliced to a motor flat cable,
which is banded to the exterior of the pump-protector motor unit. The
centrifugal pump is located at the top of the down hole unit. Some more details
of petroleum
courses in rawalpindi are as under.
The pump is hung on the
tubing string by the discharge head. Below the pump is a standard intake, which
provides for fluid entry to the pump. The center component is the protector. The
protector both equalizes external and internal pressure and isolates the motor
from the well fluid. The lowest component is the motor, which drives the
centrifugal pump. Note that the down hole unit is landed above the
perforations. This is necessary so that fluid entering the well flows past the
motor. This flow cools the motor, which is otherwise likely to overheat and
fail. TSK Training for Skills and Knowledge is the best institute in Rawalpindi
Islamabad for Pakistani Students who wants to join petroleum courses in
islamabad.
No comments:
Post a Comment