A tank battery should contain at least two tanks and usually
have a capacity equal to 4 days’ production. Technical Data used in the field
explained in petroleum
courses in Rawalpindi. All tanks should be level with each other
and have a minimum spacing of 3 ft between tanks. Local codes or specifications
may require a firewall and different spacing.
Constant attention should be given to the hazardous condition
created by iron sulfide deposits. These occur most frequently within the vapor
space and particularly on the underneath exposed side of the deck. These iron
sulfide deposits generate severe corrosion that can go unnoticed when deck
conditions are observed from the topside only.
When sour crude is stored, all openings on the tanks should
be kept closed since hydrogen sulfide is poisonous. This can be accomplished by
equipping the tanks with some type of ground-level gauging and thermometers
located in the tank shell. Gauges and temperatures then can be read from
the ground without the tank being opened. These gauging devices usually require
approval by the crude purchaser. Ground-level sampling also can be accomplished
by installing pipes that extend into the tank at any desired level and to any
desired distance. Valves are located at a convenient level to permit sampling
on the ground without the tanks being opened. If available. a small amount of
sweet gas should be fed into the top of the tank continuously to establish a
“gas sweep.” This will ensure positive pressure within the tank at all times
and will prohibit air from entering the tank, thereby greatly reducing
corrosion. It is advisable to extend the tank vent line well beyond the tank
battery and to use a backpressure valve and flash arrester in the vent line to
burn the vapors. Some more details of petroleum courses in rawalpindi are
as under. Steel tanks should be kept clean and free from spilled oil or other
material. They should be kept painted and all water or accumulated dirt should
be removed from around the bottom edge of the tanks. Thief hatches and
vent-line valves should be kept closed and inspected periodically for proper
operation and gasket condition. Should any leaks occur, they may be repaired
temporarily with lead sealing plugs or toggle bolts. These leaks should be
repaired permanently as soon as possible.
When a closing gauge is taken, and before the tank is filled
again, the pipeline valve should be sealed closed, the drain valve checked to
ensure that it is closed and the seal removed, and then the seal from the
equalizer-line valve removed. Before the tank is accepted by the crude
purchaser, the water should be drained from the tank if necessary and the valve
sealed closed. All other valves should be sealed closed except the
vapor-recovery-line valve if such a system is in use. The pipeline valve is then
unsealed and opened for delivery to the purchaser. TSK Training for Skills and